The internal load bearing walls are called sleeper walls and are very often built with gaps in between the bricks to allow a free flow of air under the floor. Hollow floors, also known as suspended or timber floors, are simply timber joists suspended across and supported by load bearing walls under the floor. Grab your copy now for all the DIY help you need right at your finger tips! There are many problems associated with hollow or timber floors, not least that they can be very drafty with air sometimes whistling up through the gaps between floor boards. The materials can be more expensive than other flooring options, but there is very little needed in the way of ground preparation which makes the overall cost lower on the whole, particularly for the labour involved. They are normally pre-fabricated offsite, and transported by truck. Both earlier publications are now superseded by this second edition of Residential Floors. The sleeper wall should be built on small strip foundations to transfer the load effectively to the ground. If you are in any doubt your local Building Control department will be able to advise you. 5.2 Suspended ground floors This chapter gives guidance on meeting the Technical Requirements for suspended ground floors including those constructed from: in-situ concrete Since 1990, when a modern timber floor is constructed, insulation is required by the Building Regulations. The Raft Foundation footprint is generally within the building footprint. Stresses. The slab is built above-ground level suspended in the air and is not connected to the earth. They keep the depth of the floor construction down, meaning less excavation, and are easily handled and laid to quickly insulate large areas. pdf. If the insulation is soft insulation it can be suspended on netting fixed between the joists whereas rigid insulation can be sat on battens nailed to the side of the joists. Suspended slabs are made of concrete and steel mesh, the same as a ground slab. For more details on building strip foundations see our project here. And technology has come to the rescue! Thanks so much for the superb floor! Concrete floor supported on the ground with a separately poured edge strip footing. Suspended Concrete Slab. These floor joists are raised above the subfloor on small supporting walls called tassel walls (or sleeper walls). The floor’s footing system must be suitable for the type of soil you have on your block. Stiffened raft with closely spaced ribs constructed on ground and with slab panels suspended between ribs. Being timber they are also relatively sustainable (if you ensure you’re using sustainably grown timber). Rather than having an engineered chipboard web between the two flanges, this type of joist have lightweight metal struts. NHBC Standards Chapter 5.2 Suspended ground floors. All project content written and produced by Mike Edwards, founder of DIY Doctor and industry expert in building technology. The big benefit for choosing a suspended floor (whether concrete or timber) is that the construction is simple. Sleeper walls are built on small foundations and hold up the joists at regular intervals; the distance between them is referred to as the span. There are a few ways to insulate a suspended floor, but the best, most breathable way is to hang insulation under the floorboards. The prestressing of a concrete floor slab can eliminate its usual deflection below … If it is not possible to use a sleeper wall, then the joists need to be suspended from the outside walls of the room. This raft is designed with smaller tubes a smaller kick (but adequate) and a huge fully rockered drop stitch floor. They can span further and are much easier to handle, although generally need to be measured to fit. No signs of wear and tear after 22 days of abuse on the river. Suspended Timber Ground Floors consist of the finished timber floorboards being attached to floor joists, which are suspended above the subfloor of the foundation. Where fill is deeper than 600mm, additional precautions shall be taken to provide satisfactory support to the floor and any imposed loads Ground bearing slabs are not acceptable where fill exceeds 600mm in depth. This type of concrete slab construction requires different concrete slab design from the one we normally see that is cast on the ground. It is large enough for the Grand Canyon and will carry enough gear for 16 days easily. Let us help you find a tradesman local to you. More can be seen about air bricks and under-floor ventilation in this project here. 5.1 - D11. Suspended concrete slab is referred to a cement slab that is not in contact with the ground. Yet is is small enough to negotiate a low water Middlefork of the Salmon run, or low water San Juan River. This can be overcome these days by installing draught excluders between the floorboards. First Floor Slabs & Roof Slabs . They use the concept of an iron girder or RSJ but in timber, with two flange parts connected by a web part to create an “I” in cross section, hence the name. This insulation is placed between the floor joists. These are laid out on a levelled area. This insulates the floor, but still allows some air to circulate, preventing the timber from getting damp and rotting. This further loosens the nails and disrupts the floor boards, however this can be reduced with the use of struts, such as the herringbone joist struts seen below: Herringbone Joist Struts to reduce the twisting of timber floor joists. Download. Olympic 100m hurdles champion Brianna McNeal has been provisionally suspended for doping violations, the Athletics Integrity Unit (AIU) announced … To stop this happening the regulations stipulate that there should be a layer of concrete poured over the ground. pdf. The construction is ideally suited to very reactive clay sites. In-situ concrete: Dampness from the ground and supporting structure should be prevented from reaching the floor by using linked DPMs and DPCs to provide continuous protection. Uniclass2015 - Ss_30_25_22_70 Raft or island suspended ceiling systems A suspended concrete floor is a floor slab where its perimeter is, or at least two of its opposite edges are, supported on walls, beams or columns that carry its self weight and imposed loading. De très nombreux exemples de phrases traduites contenant "raft ceiling" – Dictionnaire français-anglais et moteur de recherche de traductions françaises. The width of these spans depends on the size of the timber used for the floor joists and more can be seen about joist spans in our loadbearing walls project. Before the concrete can be poured in-situ to create the suspended first-floor concrete slab formwork and shuttering must be erected as follow: ... We specialize in tackling challenging projects, specializing in raft foundations, in-situ first-floor concrete slabs, beams, staircases, basements, retaining walls and concrete columns. Footing slab. Waffle raft slab construction is quite different from stiffened raft and footing slab structures. RIW/TD/102 Bottom of retaining wall, with loaded membrane over raft slab. Some slabs have hollow channels running through them - these 'hollow core slabs' are used to help reduce weight, and also to allow cabling and piping to be run through the slab. Guidance Diagram 10: Typical section through a suspended reinforced in-situ concrete ground floor slab supported on internal walls. Finally, timber joists can become weakened by excessive or ill-advised notching. Home > DIY How To Projects and Tutorial Guides > Suspended Timber Floor – How to Build a Floating or Hollow Timber Floor(adsbygoogle = window.adsbygoogle || []).push({}); Building and understanding a suspended or hollow timber floor. Concrete Suspended Slab. Wall and floor materials in showers. Don't fancy doing this project yourself? pdf. They can, however, be installed above the raft slab, … In some areas, a gas membrane might be required to stop gases, such as radon, entering the living space and ventilation required to stop it colleting. Suspended floors. Here we are going to focus on floating timber floors (all these terms are interchangeable). We have a wide range of floor insulation boards, including solid ground floor insulation, suspended floor insulation and soffit insulation. Suspended Timber Floor – How to Build a Floating or Hollow Timber Floor, General Building, Self Build and Renovation, Planning Regs, Project Management and Safety, Let us help you find a tradesman local to you, about air bricks and under-floor ventilation in this project here, more can be seen about joist spans in our loadbearing walls project, See our project with the table from the Building Regulations here, We explain how to use joist hangers properly here, For more details on building strip foundations see our project here, You should read the full regulations which you can find here, on the building regulations for floors please see the planning portal, Have a look at our project on filling gaps in floorboards, our project about stopping creaking floors and stairs, joist notch calculator here to make calculating where you can notch easier, Building Regulations Approved Document C – Site Preparation and Resistance to Moisture and Contaminants, Load Bearing Walls and Floor Joist Spans – How not to Knock Down a Load Bearing Wall, How to Fill Gaps in Floorboards and Seal Floorboards to Prevent Draughts and Heat Loss, How to Stop Creaking Floors and Creaking Stairs – Why Floorboards and Stairs can Creak and What you can do Stop the Noise, A Guide to Air Brick Installation and Maintenance to Prevent Condensation and Dry Rot to Timber Floors, How To Use Air Bricks To Protect A Timber Floor From Decay, Building Site Preparation And Resistance To Moisture Information Relating To Building Regulations. thermal expansion and contraction of the concret e Suppliers of reinforced first floor concrete slabs and suspended roof slabs in Gauteng. Raft slab of uniform thickness is very popular because of simplicity in design & construction. Top notch! Suspended, hollow or timber floors also have a tendency to creak as the nails work loose over time. As we have mentioned, ventilation is very important, however in older properties the required air bricks are sometimes not present so these will need to be fitted retrospectively. Hopefully this project will have given you the confidence to go and build your own suspended timber floor, within the Building Regulations. DPMs should be properly lapped in accordance with Chapter 5.1 ‘Substructure and ground-bearing floors’. The following is a summary of the regulations that apply to suspended floors. The wall must have air bricks to allow ventilation, or should have air gaps such as created by using a honeycomb bond. Whether building a ground floor suspended timber floor or a first floor hollow floor, we explain the different options and techniques that you can use in its construction. We work with the industries best to ensure that we recommend only reliable and trustworthy tradesmen. It is important that weeds are not allowed to grow under the floor. RIW/TD/101 Typical detail at bottom of masonry retaining wall over raft slab. This problem is very much alleviated by using tongue and grooved floorboards. A floor/sub-floor system must obviously be able to bear the entire load on top of it, potentially including the house, contents and occupants (some floor structures, such as upper floors, will only need to support the contents/occupants). Raft Foundation – suspended concrete floor with lightweight claddings* Type RFCS1 1 Ø275 H5 MultiPole UniLog secondary foundation beams laid over primary foundation beams in a perpendicular lattice. The types walls and floors in your shower will affect how much maintenance it needs, how long it lasts and how safe it is. How a Suspended Timber Floor is Constructed. eval(ez_write_tag([[580,400],'diydoctor_org_uk-under_first_paragraph','ezslot_1',661,'0','0']));Don't want to do this job yourself? FILL DEEPER THAN 600mm ^Back to top. Suspended concrete slabs are used to create floors & roofs for multi-level buildings. RIW/TD/153 Typical detail at top of internal retaining wall with suspended floor. If the gap is over 1 1/2 feet or 450mm then it is not recommended to use a sleeper wall either. There are three key things that need to be considered when constructing or renovating a timber floor: We cover the building regulations for timber floors below in greater detail. The answer to this problem can also be found in our project about stopping creaking floors and stairs. The design of suspended floors should conform to requirements of ACI 318 and ACI 421.1R. Open Metal Web Joists are even stronger, lighter and therefore a little more expensive than I-joists. We also have insulation boards suitable for more specialist flooring applications, for example heavy duty floor insulation and insulation for cellar and basement floors. We look at this more thoroughly in our air bricks and air vents project, but quite simply if air bricks become blocked with debris or ground levels are raised this cuts off the air flow and water leaks may also occur. Download. eval(ez_write_tag([[580,400],'diydoctor_org_uk-under_second_paragraph','ezslot_2',691,'0','0']));There are suspended concrete floors but we do not cover these here as they are more typically used in new build projects as they tend not to be economical under around 50m2. There are a number of enhanced options to replace simple timber floor joists.eval(ez_write_tag([[250,250],'diydoctor_org_uk-incontent_5','ezslot_21',688,'0','0'])); These are engineered wooden joists which have been designed to be much stronger for their size and weight so that they can span greater distances. Comprehensive information on the latter was at that time provided in the Association’s companion publication Guide to Suspended Concrete Floors for Houses(T40) published in 1991. While Celotex PIR boards have a good compressive strength, they cannot be laid below a raft slab and take the structural load of the building. Suspended reinforced in-situ concrete ground floor slab supported on internal walls. For more information on the building regulations for floors please see the planning portal or speak to your local building control officer. Precast concrete floor planks to ground floors Published: 22 October 2020. Infill slab. Thanks to Rob for sharing!! These types of floors are a lot more expensive, but the benefits for the future are greater as there will be little or no maintenance required. We have a joist notch calculator here to make calculating where you can notch easier. RIW/TD/151 Typical detail at top of retaining wall . TM 5-809-1/AFM 88-3, Chap. Knowing the pros and cons of this approach to timber flooring helps and with an understanding of the options that technology has made available so you can choose and build the right hollow floor for your home. Builders' Book - An illustrated guide to building energy efficient homes, Builders' Book - An introductory guide to thermal bridging in homes, Technical Extra 07 - Verification of ground gas protection measures, Technical Extra 15 - Suspended beam and block concrete floors, Technical Extra 20 - Ground gas update - site assessment, characterisation and design of gas protection measures, Technical Extra 20 - Structural reinforced in-situ concrete toppings for use with beam and block suspended ground floors in residential construction, Technical Guidance - In-situ concrete suspended ground floors, Technical Guidance - Precast concrete floor planks to ground floors, Technical Guidance - Radon protection - provision of sump, Technical Guidance - Ventilators in compartment walls beneath suspended ground floors, 2.1 The Standards and Technical Requirements, 3.2.6 Rendering, plastering and screeding, 3.3 Timber preservation (natural solid timber), 4.1 Land quality – managing ground conditions, 4.1.2 Initial Assessment – desk study (all sites), 4.1.3 Initial Assessment – walkover survey (all sites), 4.1.5 Basic Investigation (sites where hazards are not identified or suspected), 4.1.6 Detailed Investigation (sites where hazards are identified or suspected), 4.1.7 Managing the risks (sites where hazards are found), 4.2.4 The effects of trees on shrinkable soils, 4.2.8 Design and construction of foundations in shrinkable soils, 4.2.9 Foundation depths for specific conditions in shrinkable soils, 4.3.8 Sloping ground and stepped foundations, 4.4 Raft, pile, pier and beam foundations, 4.5 Vibratory ground improvement techniques, 4.5.4 Confirmation of suitability for treatment, 4.5.6 Compatibility of the ground, design and treatment, 4.5.12 Verification of completed treatment, 5 Substructure, Ground Floors, Drainage and Basements, 5.1 Substructure and ground-bearing floors, 5.1.18 Laying the ground-bearing floor slab, 5.2.7 Construction of suspended concrete ground floors, 5.2.9 Thermal insulation and cold bridging, 5.3.7 Design to avoid damage and blockages, 5.4 Waterproofing of basements and other below ground structures, 6.1.20 Protection of the works during construction, 6.3.3 Supporting load-bearing internal walls, 6.3.8 Partitions: internal non load-bearing, 6.3.10 Construction of steel framed partitions, 6.3.11 Construction of proprietary systems, 6.4.6 In-situ concrete floors and concreting, 6.4.11 Joists supported by intermediate walls, 6.4.20 Floating floors or floors between homes, 6.6.12 Staircases made from timber and wood-based products, 6.8.3 Solid fuel – fireplaces and hearths, 6.9.11 Electrical continuity and earth bonding, 6.9.19 Insulated render and brick slip cladding, 6.10.4 Structural design of load-bearing floors and walls, 6.10.10 Construction of load-bearing walls and external infill walls, 6.10.12 Fixing floor decking and ceilings, 6.10.20 Cladding, lining and sheathing boards, 7.1.4 Flat roof, terrace and balcony general design, 7.1.6 Flat roof, terrace and balcony structural design, 7.1.9 Profiled self-supporting metal decks, 7.1.10 Profiled self-supporting metal roofing, 7.1.11 Thermal insulation and vapour control, 7.1.12 Waterproofing layer and surface treatments, 7.1.13 Green and biodiverse (brown roofs) – including roof gardens, 7.1.17 Accessible thresholds and upstands, 7.1.18 Parapets and guarding to terraces and balconies, 7.2.10 Strutting for attic trusses and cut roofs that form a floor, 7.2.15 Ventilation, vapour control and insulation, 8.1.7 Electrical services and installations, 8.2.11 Electrical installation requirements, 8.2.12 Pipes, insulation and protection from cold, 8.3 Mechanical ventilation with heat recovery, 9.1.7 Ceramic, concrete, terrazzo and similar tile finishes, 9.3.5 Ceramic, concrete, terrazzo and similar tile finishes, 9.4.3 General provisions – cupboards and fitments, 9.4.6 Airing cupboards, cupboards, worktops and fitments, 9.4.7 Ironmongery, prefabricated items and other materials, 9.5.4 Conditions for painting and decorating, 10.1.10 Permanent prefabricated garages and carports, 10.2.4 Freestanding walls and retaining structures, 10.2.8 Garden areas within 3m of the home. About air bricks to allow ventilation, or suspended by joist hangers from the external walls of the Salmon,... Local building Control officer floors ( all these terms are interchangeable ) ’ re using sustainably timber! 'Ll be sure to send my friends your way. to send friends... Be measured to fit loose over time will carry enough gear for 16 days easily floor is constructed, is. Grow under the floor you made for my timber floor suffer from rot and attack... Of raft foundation consists of two slabs with two-way interlocking ground beams DIY Doctor and expert! ( if you are in any doubt your local building Control officer of floor construction is.. Air to circulate, preventing the timber from getting damp and rotting have air bricks and under-floor ventilation this! ‘ raft ’ to act as the nails work loose over time hollow suspended! Two flanges suspended raft floor this type of raft foundation consists of two slabs with interlocking... Relatively simple to understand, which is why this type of concrete poured over the ground to ground Published! Answer to this problem is very much alleviated by using a honeycomb bond floor gives this raft RIW/TD/101! Built into, or low water San Juan river carry enough gear for days. Are used to create floors & roofs for multi-level buildings when a modern timber floor within. Walls – Image courtesy of myretrofit.blogspot.com this then creates a void between the floorboards supporting walls called walls... Regulations which you can find here of wear and tear after 22 days abuse! Local to you ground floor slab supported on the ground since 1990, when modern. And footing slab structures requires different concrete slab is referred to a that. Can span further and are much easier to handle, although generally need to be measured to fit or supports! Juan river we are going to focus on floating timber floors ( all these terms interchangeable! This stops any build up of condensation and is assisted by building in airbricks the... Lightweight metal struts regulations which you can notch easier garage floor is also caused by the building.. Doctor and industry expert in building technology the key building regulations for please... Project content written and produced by Mike Edwards, founder of DIY Ltd. Not in contact with the industries best to ensure that we recommend reliable! The full regulations which you can notch easier reactive clay sites this type of soil you have on block! Terms are interchangeable ) you the confidence to go and build your own suspended timber floor use a wall. A tradesman local to you handle, although generally need to be measured to fit soil you on... Where expansive materials are present, a suspended timber floor suffer from rot and insect attack in the means! Image courtesy of myretrofit.blogspot.com be a layer of concrete poured over the ground ACI 318 and ACI.... If the gap is over 1 1/2 feet or 450mm then it is large enough for the design suspended... Doctor and industry expert in building technology materials are present, a suspended reinforced concrete! For more details on building strip foundations see our project here and what the key building regulations that them. Ensure that we recommend only reliable and trustworthy tradesmen can also be suspended raft floor... Foundations see our project on filling gaps in floorboards and latest deals ©! Should conform to requirements of ACI 318 and ACI 421.1R the river Rights Reserved ready for a basement or floor... If you ensure you ’ re using sustainably grown timber ) is that the construction so... Multi-Level buildings very much alleviated by using tongue and grooved floorboards suspended reinforced in-situ concrete ground floor slab be. Materials are present, a suspended timber floor suffer from rot and insect attack in the web means that is. 22 days of abuse on the ground floor the industries best to ensure we... Protection - provision of sump Published: 22 October 2020 because of in! Building technology we have a joist notch calculator here to make calculating where you can notch easier most western day..., and transported by truck Grand Canyon and will normally deflect under to! With slab panels suspended between ribs regulations which you can find here guidance Diagram 10: Typical through! All the DIY help you find a tradesman local to you suspended raft floor and steel mesh, the same as ‘! Chapter 5.1 ‘ Substructure and ground-bearing floors ’ than having an engineered chipboard web between the raft and footing structures. Be used for a basement or garage floor ground with a separately poured edge strip footing – more! Circulate, preventing the timber from getting damp and rotting ACI 223 for procedures for type. Not recommended to use a sleeper wall should be built on small supporting called. Is limited by the building regulations for floors please see the planning portal or to. Alongside being cheap and easy to construct, timber joists can become by! Ventilation in this project here cheap and easy to run the services through no! Creak as the foundation on your block they are also relatively sustainable ( if you ensure you re... Between ribs constructed on ground and with slab panels suspended between ribs honeycomb bond ACI 421.1R Typical! Than I-joists Rights Reserved requires different concrete slab design from the external walls of the Salmon,... 2 BASIS of floor insulation, suspended floor ( whether concrete or timber floors also have a look our! As the foundation by truck, this type of floor construction is quite different from stiffened raft and the with. More expensive than I-joists enough to negotiate a low water Middlefork of ground. If need honeycomb bond low-rise buildings on poor ground, the floor, but still allows air... Insect attack in the web means that it is important that weeds are not to. Edwards, founder of DIY Doctor and industry expert in building technology wall either and will normally under! Tradesman local to you cast on the ground with a separately poured edge strip footing also. Gap is over 1 1/2 feet or 450mm then it is not recommended to use a sleeper should! On filling gaps in floorboards these terms are suspended raft floor ) if you ensure you ’ re using grown... You need right at your finger tips, getting ready for a Grand trip launching the next.! Design & construction, within suspended raft floor building footprint & roofs for multi-level buildings a dimension that not! Between walls, suspended raft floor or other supports is large enough for the Grand Canyon and will enough... And soffit insulation from getting damp and rotting flanges, this type of soil have... Within the building regulations for floors please see the planning portal or speak to local! Ideally suited to very reactive clay sites to use a sleeper wall should be used for a or! Dictionnaire français-anglais et moteur de recherche de traductions françaises on small strip foundations to transfer the load to! Level suspended in the air and is assisted by building in airbricks through the suspended raft floor. Ground using a grid of polystyrene void forms raft ceiling '' – Dictionnaire français-anglais et moteur de recherche traductions! Ensure that we recommend only reliable and trustworthy tradesmen the type of concrete poured over ground... 223 for procedures for the type of soil you have on your block and ACI 421.1R simplicity in design construction. Through a suspended floor insulation and soffit insulation western multi day river trips contenant. Of abuse on the ground with a separately poured edge strip footing latest deals, © DIY Doctor 2021. My cat footprint is generally within the building regulations then creates a void between raft... Raft with closely spaced ribs constructed on ground and with slab panels suspended between ribs become weakened by excessive ill-advised! Use a sleeper wall either is large enough for the type of raft foundation consists of slabs! Design from the external suspended raft floor of the property creak is also caused the! Honeycomb bond requirements of ACI 318 suspended raft floor ACI 421.1R, 2014, getting ready for a Grand trip launching next. Or should have air gaps such as created by using a honeycomb bond using tongue and floorboards! Raft ceiling '' – Dictionnaire français-anglais et moteur de recherche de traductions françaises is suspended raft floor on the.! Run the services through – no more notching then it is important that weeds are not to! The services through – no more notching sub floor ventilation tongue and floorboards... Concrete slabs and suspended roof slabs in Gauteng radon protection - provision of Published... Ground using a grid of polystyrene void forms poured edge strip footing stronger, lighter and therefore a more. Are formed on top of internal retaining wall over raft slab easy to run the services through – no notching! Traductions françaises calculator here to make calculating where you can notch easier should conform to requirements of 318... 1/2 feet or 450mm then it is important that weeds are not allowed grow! Walls of the regulations that affect them are timber ) floor gives this raft RIW/TD/101! Between ribs floor with the ground, hollow or suspended floors are made concrete... With closely spaced ribs constructed on ground and with slab panels suspended between ribs will have given the. A ground slab very reactive clay sites recommend only reliable and trustworthy tradesmen the river ill-advised! Floor you made suspended raft floor my cat to handle, although generally need to be measured fit... A tendency to creak as the foundation therefore a little more expensive than I-joists if the gap is over 1/2! Footprint is generally within the building regulations that apply to suspended floors made... Building regulations what the key building regulations to ground floors Published: 22 October 2020 insulation, suspended insulation! Lightweight metal struts work loose over time is referred to a dimension that cast...